ACI 347-14 provides the consensus standard for the design, construction, and removal of these temporary systems. In the context of excavation, the standard outlines the critical requirements for withstanding soil pressures, surcharge loads, and environmental forces such as wind and water. One of the document's most vital contributions is its codification of the responsibilities of the contractor and the engineer. It stipulates that formwork—and by extension, excavation shoring systems—must be designed by a qualified person. This distinction is crucial in excavation support, where the variability of soil conditions requires a bespoke engineering approach rather than a "one-size-fits-all" solution.
ACI 347.14 is a guide published by the American Concrete Institute that provides recommendations for the design, construction, and quality control of accelerated bridge construction (ABC) projects. The guide is specifically focused on the construction of bridges using accelerated techniques, which involve rapid construction methods to minimize traffic disruptions and reduce the overall construction time.
According to ACI guidelines, formwork design must balance three primary, competing objectives:
Temporary vertical supports installed to sustain the weight of formwork, freshly placed concrete, and construction live loads. Shoring transmits these forces directly to a solid foundation or to lower finished floors that have achieved sufficient strength.
Lateral Pressure: The horizontal force exerted by fresh concrete against vertical forms.
– Applies to all types of formwork (wood, metal, prefabricated systems) for buildings, bridges, and other concrete structures.
In concrete construction, the temporary structure that holds the concrete in place while it cures—formwork—can account for up to 60% of the total cost of a concrete structure. Ensuring safety, quality, and economy in this critical area is the primary objective of .
Below is an outline and summary for a technical paper on ACI 347-14.
Guidelines for calculating vertical and horizontal loads, safety factors, and material selection.
Ensuring form joints are completely watertight to prevent grout leakage, which causes honeycombing and discoloration. Summary of Code Compliance ACI 347-14 Standard Recommendation Standard Unit Weight 150 lb/ft³ (2400 kg/m³) for normal-weight concrete Minimum Live Load 50 lb/ft² (75 lb/ft² if using motorized buggies) Tie Safety Factor Minimum 2.0 for standard form ties Deflection Limit Typically 1/360 of the span for architectural surfaces Conclusion
Specific design considerations and safety factors for various formwork accessories.
The ACI 347-14 PDF is structured to cover every aspect of formwork, from initial planning to final removal. Key sections include: 1. General Considerations
: Specifies acceptable deviations for finished concrete surfaces (e.g., plumbness, level, and cross-sectional dimensions) [8]. Stripping and Reshoring
Building inspectors and forensic engineers reference this text during audits or post-accident investigations to determine liability. 3. Formwork Design Loads and Pressures
Procedures for verifying that formwork is constructed according to the design. 4. Materials
Aci 34714 Pdf __full__ -
ACI 347-14 provides the consensus standard for the design, construction, and removal of these temporary systems. In the context of excavation, the standard outlines the critical requirements for withstanding soil pressures, surcharge loads, and environmental forces such as wind and water. One of the document's most vital contributions is its codification of the responsibilities of the contractor and the engineer. It stipulates that formwork—and by extension, excavation shoring systems—must be designed by a qualified person. This distinction is crucial in excavation support, where the variability of soil conditions requires a bespoke engineering approach rather than a "one-size-fits-all" solution.
ACI 347.14 is a guide published by the American Concrete Institute that provides recommendations for the design, construction, and quality control of accelerated bridge construction (ABC) projects. The guide is specifically focused on the construction of bridges using accelerated techniques, which involve rapid construction methods to minimize traffic disruptions and reduce the overall construction time.
According to ACI guidelines, formwork design must balance three primary, competing objectives:
Temporary vertical supports installed to sustain the weight of formwork, freshly placed concrete, and construction live loads. Shoring transmits these forces directly to a solid foundation or to lower finished floors that have achieved sufficient strength. aci 34714 pdf
Lateral Pressure: The horizontal force exerted by fresh concrete against vertical forms.
– Applies to all types of formwork (wood, metal, prefabricated systems) for buildings, bridges, and other concrete structures.
In concrete construction, the temporary structure that holds the concrete in place while it cures—formwork—can account for up to 60% of the total cost of a concrete structure. Ensuring safety, quality, and economy in this critical area is the primary objective of . ACI 347-14 provides the consensus standard for the
Below is an outline and summary for a technical paper on ACI 347-14.
Guidelines for calculating vertical and horizontal loads, safety factors, and material selection.
Ensuring form joints are completely watertight to prevent grout leakage, which causes honeycombing and discoloration. Summary of Code Compliance ACI 347-14 Standard Recommendation Standard Unit Weight 150 lb/ft³ (2400 kg/m³) for normal-weight concrete Minimum Live Load 50 lb/ft² (75 lb/ft² if using motorized buggies) Tie Safety Factor Minimum 2.0 for standard form ties Deflection Limit Typically 1/360 of the span for architectural surfaces Conclusion The guide is specifically focused on the construction
Specific design considerations and safety factors for various formwork accessories.
The ACI 347-14 PDF is structured to cover every aspect of formwork, from initial planning to final removal. Key sections include: 1. General Considerations
: Specifies acceptable deviations for finished concrete surfaces (e.g., plumbness, level, and cross-sectional dimensions) [8]. Stripping and Reshoring
Building inspectors and forensic engineers reference this text during audits or post-accident investigations to determine liability. 3. Formwork Design Loads and Pressures
Procedures for verifying that formwork is constructed according to the design. 4. Materials