Do not overtighten, as this can strip the hardware or crack the wood.
Place the crib on its final carpeted location before final tightening. Carpet can hide an uneven floor. Shim the legs if necessary, then tighten.
Do not just dump the hardware into a pile. Take the time to separate screws, bolts, and wooden dowels into small bowls or plastic bags, labeling them according to the manual. Do not overtighten, as this can strip the
You have the wrong bolt in the wrong hole. The Parkland uses two lengths of bolts. Short bolts are for the toddler guard rail. Never force a long bolt into a short hole.
Usually a 4mm or 5mm size, which is the primary tool for almost all Babi Italia hardware. Shim the legs if necessary, then tighten
Follow these steps for the standard, full-size crib setup. Do not fully tighten any bolts until the entire frame is connected. This allows for necessary adjustments. Step 1: Attach the Side Panels to the Headboard
use power drills, as they can strip the wood or over-tighten the bolts. Hardware Components: You have the wrong bolt in the wrong hole
Ensure they are flush and secure before flipping the panels upright. 2. Build the Main Frame Action: Connect the side panels to the headboard.
Securely fasten the mattress support at your chosen height using the included bolts. Make sure it's level and doesn't shift when you apply gentle pressure.
Go around the entire crib with your Allen wrench and tighten every bolt until snug.
Bolt the four corners of the mattress spring to the installed height adjustment brackets. Step 3: Attach the Front Stationary Rail